Traffic Update For Goulburn Valley Residents

Attention drivers!


27 August 2018

Ebony Reeves

construction world

Today VicRoads announced that maintenance works will commence in various locations throughout Shepparton and district from 29th August – 30th September.

The maintenance will include patching the road to prepare a smooth surface for resealing. This will be carried out between 7am – 6pm on the following roads:

  •        Barmah-Shepparton Road
  •        Benalla-Tocumwal Road
  •        Echuca-Mooroopna Road
  •        Katamatite-Nathalia Road
  •        Katamatite-Shepparton Road
  •        Mooroopna-Murchison Road
  •        Murray Valley Highway (between Cobram and Nathalia)
  •        Goulburn Valley Highway (between Congupna and Numurkah)

Traffic will be reduced to a single lane and a 40 km/h speed limit will apply throughout the duration of the maintenance works.